CHECKLIST FOR INTERNAL PAINT WORK



Internal Painting Works

Paint is a final finish on wall and it should be done with care and should be checked during various stages as per checklist.


Points to remember before start paint on wall
  • All civil and electrical works should be complete
  • Main door erected with locking arrangements
  • Wall surface dry checked
  • Alkalinity of wall surface should be checked
  • Dirt and dust particles removed off from wall surface by papering
  • Electrical boards/switches/windows/decorative pieces /covered properly with masking tape
  • Floor should be covered by plastic thin film or pop material.
  • Material - Primer, paint, putty, to be used of approved brand /color / shade/ texture.
  • Brush /roller /water paper/ emery paper/sand paper to be used standard

Procedures to be followed during internal painting
  • Primer coat applied ( 1st coat) as specified
  • Putty applied over primer (to eliminate the undulations in wall ) as specified
  • Papering of putty done
  • Gattu Primer coat applied ( 2nd coat ) as specified
  • Paint applied as specified ( minimum 2 coats)
  • Use of roller to give required texture as specified for application of paint

Procedures to be followed after internal painting
  • Finished surface texture satisfactory
  • Cleaning of flooring / window panes /electrical fixtures / fittings / skirting etc. done as specified