Internal Painting Works
Paint is a final finish on wall and it should be done with care and should be checked during various stages as per checklist.
Points to remember before start paint on wall
- All civil and electrical works should be complete
- Main door erected with locking arrangements
- Wall surface dry checked
- Alkalinity of wall surface should be checked
- Dirt and dust particles removed off from wall surface by papering
- Electrical boards/switches/windows/decorative pieces /covered properly with masking tape
- Floor should be covered by plastic thin film or pop material.
- Material - Primer, paint, putty, to be used of approved brand /color / shade/ texture.
- Brush /roller /water paper/ emery paper/sand paper to be used standard
Procedures to be followed during internal painting
- Primer coat applied ( 1st coat) as specified
- Putty applied over primer (to eliminate the undulations in wall ) as specified
- Papering of putty done
- Gattu Primer coat applied ( 2nd coat ) as specified
- Paint applied as specified ( minimum 2 coats)
- Use of roller to give required texture as specified for application of paint
Procedures to be followed after internal painting
- Finished surface texture satisfactory
- Cleaning of flooring / window panes /electrical fixtures / fittings / skirting etc. done as specified