STEPS TO BE TAKEN BEFORE DEMOLISH EXISTING BUILDING
STEPS TO BE TAKEN BEFORE DEMOLISH EXISTING BUILDING
As per IS 4130 - 1991
As per IS 4130 - 1991
- Before start sabotage check all the electrical connections should be disconnected.
- If there any gas line in building then separate it with water line, steam line and any other services.
- If old building was deteriorate by any fire incident then support the roof or slab of building with props and C sections.
- Don't dismantling the building at night time if there any residence.
- Provide some supports to nearest building to prevent any harm of their walls.
- If there any feasibility of damage of nearest building then it is imperative to evacuate it.
- During the demolishing, workers should wear safety accessories like helmet, goggles, gumboot, hang gloves etc.
- At the area of dismantling, install a notice that this area is prohibited to enter.
- next to the site of sabotage, close the movement of men and vehicles.
- If the building is more than 7.5 meter height and traffic can't be stopped then install side walk shed of 4 meter height.